International Consultant for Geospatial Waste Fee Payment System for Cambodia Solid Waste and Plastic Management Improvement Project
| For : | Cambodian Only |
| Categories : | Any major |
| Schedule : | Full time job |
| Sex : | Male, Female |
| Language : | English |
| Location : | Phnom Penh |
| Hiring : | Many |
| Closing Date : | 10th November 2025 |
| Salary : |
Negotiable
|
| Experience : | Yes |
| Degree : |
Introduction
The objective of the solid waste and plastic management improvement project (the Project) is to improve solid waste and plastic management in selected areas. The project will be implemented over a period of 6 years (2023-2029), and budget of US$67.3 million will be allocated for the following four components: Component 1 – Institutional Strengthening for Solid Waste and Plastic Management (US$ 4.32 million, implemented by Ministry of Environment), Component 2 – Integrated Solid Waste and Plastic Management, Planning, Monitoring, and Capacity Building for Participating Provinces, Municipalities and Districts (US$8.42 million, implemented by Ministry of Interior). Component 3 – Solid Waste and Plastic Management Infrastructure (US$54.56, implemented by Ministry of Public Works and Transport) and Component 4 –emergency response with zero allocation has been provisioned for the Bank to provide emergency support in the event of a natural disaster, emergency and/or catastrophic event.
The Project Development Objective (PDO) and Key Results Indicators
The PDO is to improve solid waste and plastic management in selected areas, and in case of an Eligible Crisis or Emergency, respond promptly and effectively to it. There are three PDO level indicators that will be measured through the following indicators: (i) Proportion of population in selected areas with regular household waste collection, to be measured by the percentage of population that will have regular waste collection; (ii) the landfill disposal capacity operational per defined criteria, to be measured by the amount of landfill disposal capacity that will be realized under the project in Cubic Meter (m3); (iii) plastics policies, guidelines, or standards developed, to be measured by the number of policies, guidelines or standards developed; and (iv) the percentage of municipal solid waste recovered, recycled, composted and/or treated with other techniques.
- English - Fluent
The selection process will be carried out in accordance with provisions set forth in the Government Procurement Manual for Externally Financed Projects/Programs in Cambodia and Approved Selection Method for Individual Consultants - Section VII. Approved Selection Methods: Consulting Services of the World Bank Procurement Regulations for IPF Borrowers Fourth Edition (November 2020).
The detailed Terms of Reference (ToR) for the assignment can be found with the link below:
- International Consultant for Geospatial Waste Fee Payment System
- National geospatial waste fee Payment Specialist
Interested candidates are requested to obtain detailed terms of reference (TOR) and send your expression of interest (EOI) by submitting the updated curriculum vitae with current photo and cover letter with at least three referees by email provided in the contact deails.
Only Shortlisted candidates will be contacted for interview.
Help Khmer Online Jobs
When you apply for this job, if possible please mention that "You see this job announcement in www.khmeronlinejobs.com".Thanks, From Khmer Online Jobs Team
| Company : | Cambodia Solid Waste and Plastic Management Improvement Project |
| Contact Name : | H.E Buon Heng, Project ManagerMr. Ung Keorattanak, Deputy Project ManagerMr. Soun Samreth, Procurement Officer |
| Email : | b.heng@ncdd.gov.kh rattanak.ukr@gmail.com dst.samreth@gmail.com |
| Address : | Ministry of Interior Office, 3rd Floor, Room No. 356, Preah Norodom Street, Sangkat Tonle Basak, Khan Chamkar Mon, Phnom Penh, Cambodia |
